Capabilities

Automated production line
12,000 m² Production plant
Capabilities

From coil to container, under one roof.

Laser cutting, CNC bending, robotic welding and a seven-stage pre-treatment line feed a single powder-coat tunnel. Because the whole process is in-house, a colour change or a custom size costs days, not months.

150+Production, QC and engineering staff across two shifts
0.6–1.2 mmCold-rolled steel gauges, laser cut and CNC bent
7-stagePre-treatment before powder coating, salt-spray tested
30–45 daysTypical production lead time for container orders
Compliance

Audited, tested, documented.

  • ISO 9001:2015Certified
  • ISO 14001:2015Certified
  • OHSAS 18001:2007Certified
  • China Environmental LabellingCertified
Quality control

Every container leaves with a photo report.

Incoming material inspection, in-process checks on every batch, and a pre-shipment inspection with photographs before the container is sealed.